Considerable research has been undertaken and there is a need for persistent supply and demand for logistics centres in Hertfordshire and more widely, the South-East.

Our proposals for the logistics centres on land north east of Elton Way will deliver a significant number of benefits to the local area and Hertfordshire.

Key benefits

Helps to meet the need for additional employment opportunities

Enhancement of the Public Right of Way into Bushey from Patchetts Green to increase connectivity

Remediate a former landfill site

Highway Improvements including improvements to Hartspring roundabout

Increase in landscaping on the site along with the creation of ecological habitats

Electric vehicle charging points

Cycle parking

Improved sustainable transport options including cycling and pedestrian routes

New bus route to service the A41 corridor and to connect Elstree & Borehamwood Station to Watford Junction station

Sustainability

A range of sustainability measures will be brought forward as part of the Outline application. In doing so, the Outline application will look to meet the BREEAM Excellent standard which will ensure that the scheme has a limited impact on the wider environment.

In addition to electric vehicle charging points throughout the site, some other sustainability credentials that will be delivered include:

  • Sustainable and responsibly sourced building materials
  • All-electric water and space heating systems, such as heat pumps
  • A variety of shading methods to assist with cooling
  • Passive opening methods for ventilation
  • Provision of electric vehicle charging points, and cycle facilities
  • Solar Panels

We are also exploring a number of other technologies for incorporation at the Reserved Matters stage.

Access

There will be one main vehicular access point from the A41, which will be a signalized junction into the site. From here, a main through an internal road will be created connecting the development. These proposals have been discussed with Hertfordshire Highways to ensure they meet the appropriate guidance.

Updated parameter plans
Key
  • Planning application boundary
  • Development zone 1A
  • Development zone 1B
  • No built zone
  • Infrastructure zone within no built zone
  • Existing pedestrian zone to be retained
  • New vehicular access location
  • Existing vehicular access to be retained
  • Indicative extent of off-site highway works to be secured by way of S278 agreement
Updated parameter plans

Have your say

We would like to hear from the local community
Share your thoughts on our proposals for land north east of Elton Way, Watford, by completing our online survey.

Start the survey

If you have any questions, feedback or wish to be kept in touch please contact us using the information below:

Call: 0800 148 8911
Email: info@eltonway-consultation.co.uk
Write: Freepost MEETING PLACE CONSULTATION (no stamp required)